INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZ-CD 1.6 (Y6)]


id0113b4801900

Предупреждение
•  A hot engine and intake air system can cause severe burns. Turn off the engine and wait until they are cool before removing the intake air system.
•  Fuel line spills and leakage from the pressurized fuel system are dangerous. Fuel can ignite and cause serious injury or death and damage. Fuel can also irritate skin and eyes. To prevent this, always complete the “Fuel Line Safety Procedure”. (See МЕРЫ ПРЕДОСТОРОЖНОСТИ ПЕРЕД ПРОВЕДЕНИЕМ РЕМОНТА [MZ-CD 1.6 (Y6)].)

1.  Remove the battery cover. (See СНЯТИЕ И УСТАНОВКА АККУМУЛЯТОРНОЙ БАТАРЕИ [MZ-CD 1.6 (Y6)].)

2.  Disconnect the negative battery cable.

3.  Remove the engine cover.

4.  Remove the EGR valve, EGR water cooler and pipe when removing the intake manifold. (See СНЯТИЕ И УСТАНОВКА КЛАПАНА EGR [MZ-CD 1.6 (Y6)].)

5.  Remove the high-pressure fuel pipe. (See СНЯТИЕ И УСТАНОВКА ФОРСУНКИ [MZ-CD 1.6 (Y6)].)

6.  Remove in the order indicated in the table.

7.  Install in the reverse order of removal.

8.  Inspect all related parts by performing “AFTER SERVICE PRECAUTION”. (See AFTER REPAIR PROCEDURE [MZ-CD 1.6 (Y6)].)

am3zzw00001442

1
Air hose
2
Combined MAF sensor and IAT sensor
3
Air cleaner
4
Ventilation hose
5
Air pipe
6
Turbocharger
7
Upper cylinder head cover
8
Air by pass valve (High power-Euro 4)
9
Air hose (air pipe (intake throttle valve component) (Standard power-Euro 4))
10
Charge air cooler pipe and hose
11
Charge air cooler
12
Resonance chamber
13
Intake manifold


Charge Air Cooler/Resonance Chamber Removal Note

1.  Remove the front bumper when removing the charge air cooler and/or resonance chamber. (See СНЯТИЕ И УСТАНОВКА ПЕРЕДНЕГО БАМПЕРА.)

2.  Remove the PCM when removing the resonance chamber. (See PCM REMOVAL/INSTALLATION [MZ-CD 1.6 (Y6)].)


Intake Manifold Installation Note

1.  Temporarily tighten the bolts then tighten the bolts when instal the upper cylinder head cover. (See Upper Cylinder Head Cover Installation Note.)


Resonance Chamber Installation Note

1.  Temporarily tighten bolt A, then tighten in the order of B, A and C.

Tightening torque
7.9—11.7 N·m {80.6—119.3 kgf·cm, 70.0—103.5 in·lbf}
am3zzw00001443

2.  Install the PCM. (See PCM REMOVAL/INSTALLATION [MZ-CD 1.6 (Y6)].)


Clamp Installation Note

1.  Install the clamp as shown in the figure.

am3zzw00001444

2.  Tighten the charge air cooler pipe installation bolt and nut in the order shown in the figure.

am3zzw00001445


Upper Cylinder Head Cover Installation Note

Примечание
•  Install the upper cylinder head cover and the intake manifold retaining bolts in the sequence shown.

1.  Tighten the intake manifold and upper cylinder head cover installation bolts in the following steps.

(1)  Temporarily tighten the bolts.
(2)  Tighten the bolts in the order shown in the figure.

Tightening torque
8.9—12.1 N·m {90.8—123.3 kgf·cm, 78.8—107.0 in·lbf}
am3zzw00001446

Air Cleaner Installation Note

1.  Using the strap, secure the shroud panel and the mount rubber as shown in the figure.

am3zzw00001447