PCM REMOVAL/INSTALLATION [MZ-CD 1.6 (Y6)]


id0140b2802400

1.  Remove the battery cover. (See СНЯТИЕ И УСТАНОВКА АККУМУЛЯТОРНОЙ БАТАРЕИ [MZ-CD 1.6 (Y6)].)

2.  Disconnect the negative battery cable.

3.  Remove the LH wheel and tire.

4.  Remove the LH mudguard.

5.  Remove in the order indicated in the table.

am3zzw00001031

1
PCM cover
2
PCM security bracket and security bracket sheer bolt (if equipped)
3
PCM connector
4
PCM

6.  Install in the reverse order of removal.


PCM Security Bracket And Security Bracket Sheer Bolt Removal Note

Осторожно
•  Do not place excessive strain on the PCM wiring harness.

1.  File flat across the PCM security bracket welded nut.

am3zzw00001032

2.  Drill a 2 mm {0.08 in} pilot hole 3 mm {0.12 in} from the outer edge of the security bracket welded nut at an angle of approximately 2°.

3.  Drill a 5 mm {0.2 in} hole in the security bracket welded nut and remove the security bracket sheer bolt.

am3zzw00001033

4.  Slide the security bracket off of the PCM.


PCM Connector Removal Note

1.  Detach the PCM electrical connectors in the sequence shown.

am3zzw00001034


PCM Removal/Installation Note

1.  When replacing with a new PCM, perform the following procedure:

(1)  Remove the old PCM.
(2)  Install the new PCM.
(3)  Perform the PCM parameter reset for the immobilizer system on the new PCM using the M-MDS. (See ЗАМЕНА КОМПОНЕНТА СИСТЕМЫ ИММОБИЛАЙЗЕРА / ПРОГРАММИРОВАНИЕ И УДАЛЕНИЕ КЛЮЧА [СИСТЕМА ДИСТАНЦИОННОГО УПРАВЛЕНИЯ ЗАМКАМИ АВТОМОБИЛЯ].) (See ЗАМЕНА КОМПОНЕНТА СИСТЕМЫ ИММОБИЛАЙЗЕРА / ПРОГРАММИРОВАНИЕ И УДАЛЕНИЕ КЛЮЧА [СИСТЕМА ДОСТУПА В АВТОМОБИЛЬ И ПУСКА ДВИГАТЕЛЯ БЕЗ КЛЮЧА].)
(4)  Remove the new PCM.
(5)  Install the old PCM.
(6)  Perform the PCM configuration using the M-MDS. (See PCM CONFIGURATION [MZ-CD 1.6 (Y6)].)
(7)  Reset the EGR valve base value using the M-MDS. (See EGR VALVE BASE VALUE RESET [MZ-CD 1.6 (Y6)].)
(8)  Reset the intake throttle valve base value using the M-MDS. (See INTAKE THROTTLE VALVE BASE VALUE RESET [MZ-CD 1.6 (Y6)].)


PCM Security Bracket And Security Bracket Sheer Bolt Installation Note

Примечание
•  Install a new PCM security bracket and security bracket sheer bolt.

1.  Tighten the security bracket sheer bolt until the head of the sheer bolt is sheered off.