INTAKE SHUTTER VALVE POSITION SENSOR INSPECTION [MZR-CD (RF Turbo)]
id0140f1445800
-
Note
-
• Perform the following test only when directed.
Voltage Inspection
1. Turn the engine switch to ON.
2. Monitor the TP1 PID using the M-MDS.
-
• If not as specified, perform the “Circuit Open/Short Inspection”.
-
3. Start the engine and warm up the engine completely.
4. Monitor the TP1 PID using the M-MDS at idle.
-
• If not as specified, perform the “Circuit Open/Short Inspection”.
-
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [MZR-CD (RF Turbo)].)
2. Disconnect the intake shutter valve connector.
3. Inspect for open/short circuit in the following wiring harnesses.
-
• If there is open/short circuit, repair or replace wiring harnesses.
Open circuit
-
• Intake shutter valve terminal C and PCM terminal 70
• Intake shutter valve terminal E and PCM terminal 45
• Intake shutter valve terminal F and PCM terminal 86
Short circuit
-
• Intake shutter valve terminal C and power supply
• Intake shutter valve terminal E and power supply
• Intake shutter valve terminal E and body ground
• Intake shutter valve terminal F and power supply
• Intake shutter valve terminal F and body ground